Maintenance of platforms AMER 5 &GHARB 4 : - Client : GPC
- Location : Red Sea
- Scope :
- Fabrication / Repair For (Safety Net Pipes, Hand Rails, Ladders, Gratings, Boat landing & Barge Bumper Dismantling & Erection For (Safety Net Pipes, Heli Deck Safety Net, Hand Rails, Ladders, Gratings, Boat landing & Barge Bumper)
- Platform Cleaning.
- Platform Sandblasting & Painting.
- Repair Splash Zone (S.B& Painting).
- Sea Bed Cleaning.
- Video Survey on P/F Jacket.
|
|
Supply & install of submarine power cable : - Client : SOPC
- Location : Suez
- Scope :
- Supply a medium voltage submarine power cable including fiber optics cable (total length 4300 m) .
- Seabed scan and pre survey for the laying path.
- Laying the new cable from onshore to our terminal platform acc.
- To the attached drawing no. CE-0094-101
- Prepare a video/CD for the cable after laying.
|
|
Risers Project : - Client : GUPCO
- Manpower : 80 Engineers & Technicians
- Brief: Replacement And Installation Of Risers And Closing Spools For The GOS Pipelines Project Including Installation Of The Closing Spools, Risers Clamps, Riser Guards
|
|
Rehabilitation for WP-C Platform : - Client : Petrogulf
- Manpower : 22 Engineers & Technicians
- Brief: RContinue Rehabilitation For WP-C Platform Boat Landing Repair
|
|
Life Boats Project : - Client : Petrobel
- Manpower : 10 Engineers & Technicians
- Brief: Maintenance Works For 12 Life Boats In All Petrobel Offshore Sites
|
|