- Client : ENI
- Location : -
- Description :
Global Maintenance contract - Date : 2015 / 2016
- Duration : -
- Value : -
|
|
- Client : Eni- Iraq
- Description :
Provision Electrical / Instrumentation Maintenance Services:- Execution of the Electrical and Instrumentation Maintenance Works on all the degassing station, peripheral stations, as well as in the well head surface areas.
- Execution of preventive, predictive, corrective maintenance electrical & instrumentation works.
- Execution of required minor E&I plant improvements and minor E&I modifications.
- Procurement of relevant consumables, spare parts.
- Date : 29/05/2012
- Duration : 2 years
- Value : $ 27 M
|
|
- Client : Eni- Iraq
- Description :
Provision of Mechanical Maintenance Services:- Execution of the Mechanical Maintenance Works on all the degassing station, peripheral stations, as well as in the well head surface areas.
- Execution of preventive, predictive, corrective maintenance mechanical works.
- Execution of required minor E&I plant improvements and minor mechanical modifications.
- Procurement of relevant consumables, spare parts.
- Date : 29/05/2012
- Duration : 2 years
- Value : $ 25 M
|
|
- Client : Eni- Iraq
- Description :
Provision Generators Maintenance Services :- Personnel, Equipment and Spare parts for preventive maintenance and overhauling of ESP generators at Zubair Field (52 well).
- Date : -
- Duration : 2 years
- Value : $ 12 M
|
|
- Client : Eni- Iraq
- Description :
Provision of inspection, refurbishment, repair & commissioning of oil tank:- Tanks inspection, repair, alteration and reconstruction as per API standards 653 in order to:
- Restore the proper tank functionality till the commissioning and start up. Including bottom plates replacement.
- Replace annular bottom plates ring, sweep or Sandblasting for all the shell, top cover, internal accessories and structure, internal inspection with thickness survey for shell plate, top cover plate, structure.
- Replace portions of shell and roof based on condition and relevant standards.
- Date : 02/09/2013
- Duration : 3 years
- Value : $ 19 M
|
|
- Client : Ratba'a General Contracting Co.
- Description :
Providing Inspection Services:- Provide PQR and RT for the Majnoon flow lines project.
- Date : 23/02/2013
- Duration : 6 Months
- Value : Daily Rate
|
|
- Client : Orascom
- Description :
Cathodic Protection Services:- Design, Engineering and supply cathodic protection system for interior surface for raw water storage tank, fire protection water storage tank, service water storage tank, demineralized water storage
- Date : 17/03/2013
- Duration : 6 Months
- Value : 45 K.L.E
|
|
- Client : SAIPEM
- Description : Provision of construction work for new gas compressor system.
- Date : 15/09/2013
- Duration : 4 Months
- Value : $ 1.5 M
|
|
- Client : STX
- Description :
Existing DGS Firefighting Construction Work:- EMC awarded from STX Heavy Industries Company to construct the new firefighting network in order to replace the old existing one located in Zubair degassing station/Basra.
- Date : 19/09/2013
- Duration : 6 Months
- Value : $ 2.5 M
|
|
- Client : STX
- Description : Existing DGS firefighting construction works for hamma field.
- Date : 15/10/2013
- Duration : 6 Months
- Value : $ 1.9 M
|
|
- Client : STX
- Description : Provision of hot tapping services.
- Date : 15/10/2013
- Duration : -
- Value : $ 150 K
|
|
- Client : ENI
- Location : Iraq – Zubair Fields
- Description :
Zubair Fields Mechanical and E&I Global Maintenance Contracts- EMC Started two new Mechanical and E&I Global Maintenance Contracts at Iraq for 2 Years, the contract scope includes provision of mechanical and E&I maintenance services for the existing degassing stations.
- The contract aim is to provide the necessary maintenance services that enable ENI to increase the oil production rates to be 450 KBOPD.
- Date : -
- Duration : -
- Value : -
|
|
- Client : Eni Iraq BV
- Location : Iraq – Zubair Fields
- Description :
Mechanical Maintenance services - Date : -
- Duration : 3 Years
- Value : -
|
|
- Client : Eni Iraq BV
- Location : Iraq – Zubair Fields
- Description :
E&I Maintenance services - Date : -
- Duration : 3 Years
- Value : -
|
|
- Client : Eni Iraq BV
- Location : Iraq – Zubair Fields
- Description :
ESP Genset Maintenance and overhaul services - Date : -
- Duration : 3 Years
- Value : -
|
|
- Client : Eni Iraq BV
- Location : Iraq – Zubair Fields
- Description :
Provision of Inspection, Refurbishment, Repair and Commissioning of Oil Tank - Date : -
- Duration : 3 Years
- Value : -
|
|
- Client : Eni Iraq BV
- Location : Iraq – Zubair Fields
- Description :
PPiping Fabrication and construction work - Date : -
- Duration : 3 Years
- Value : -
|
|
- Client : Eni Iraq BV
- Location : Iraq – Zubair Fields
- Description :
Inspection and maintenance of lifting equipments - Date : -
- Duration : 3 Years
- Value : -
|
|
- Client : Basra Gas-Shell
- Location : All Basra Fields
- Description :
Quick Win Contract for Mechanical ,electrical and instrumentation work - Date : -
- Duration : 1 Year
- Value : -
|
|
- Client : Roo-BP
- Location : Rumaila Fields
- Description :
Provision of Inspection, Refurbishment, Repair and Commissioning of Oil Tank - Date : -
- Duration : 2 Years
- Value : -
|
|
- Client : Sajer-Saipem
- Location : All Zubeir Fields
- Description :
Mechanical ,electrical and instrumentation, Pre-commisoing &commissioning work for Booster gas compression station - Date : -
- Duration : 1 Year
- Value : -
|
|
- Client : Sajer-Saipem
- Location : West - Querna
- Description :
WEST QURNA I IRAQ PROJECT - Mechanical, Painting and Insulation Works - (M-075) Main Outfall Drain (MOD) Intake & Facilities - Date : -
- Duration : 1 Year
- Value : -
|
|
- Client : Weatherford
- Location : All Zubeir Fields
- Description :
Mechanical ,electrical and instrumentation ,Precommisoing &commisioing work - Date : -
- Duration : 1 Year
- Value : -
|
|
- Client : ABB
- Location : Khor EL Zubeir Power Plant
- Description :
Electrical & Instrumentaion Services - Date : -
- Duration : 1 Year
- Value : -
|
|
- Client : STX heavy Equipments
- Location : All Zubeir Fields
- Description :
Installation & fabrication of fire fighting system - Date : -
- Duration : 1 Year
- Value : -
|
|
- Client : STX heavy Equipments
- Location : All Zubeir Fields
- Description :
MV& LV Panels modification - Date : -
- Duration : 3 Months
- Value : -
|
|
- Client : STX heavy Equipments
- Location : All Zubeir Fields
- Description :
Camp extension work - Date : -
- Duration : 3 Months
- Value : -
|
|